Electrics and External Progress
The temporary barrier between our garden and Henri's has been taken down in preparation for laying the foundations of the wall that has to be built there. So for a while the dogs cannot be ....
The temporary barrier between our garden and Henri's has been taken down in preparation for laying the foundations of the wall that has to be built there. So for a while the dogs cannot be ....
The tie bar arrived late last night and when I arrived this morning it had already been positioned. I helped with the tensioning but essentially it is done and the remaining wall can be taken ....
When I arrived this morning after leaving early on Friday I was pleased to find the BBQ and Workshop area had been prepared and compacted along with the cleanse and preparation of the bike store. ....
With the pathway down to the house, The contractors concentrated on breaking out and levelling the internal floor and removing the internal wall. They did not take it all down as there was concern about ....
Tea time over I took these high level shots to show the trenches all filled. Philippe and I then turned our attention to removing the rest of the first floor (or at least the bits ....
Finally managed to apply the chain saw to the tree. Just the stump to remove now. Organised the temporary connections for the water mains but without the counter I am stuck as I cannot turn ....
Well, actually it is their contractors. they made a good start but managed to dig through the mains and cut off the water to all our neighbours. I was very popular. Had to wait until ....
With the upper floor clear, I need to turn my attention to the stones and tiles in the future kitchen and laundry space as it all has to be cleared before the builder arrives. From ....