Ground Floor Tiling 4
It is Monday morning and although I came over on Saturday to see what was happening I forgot to take a photo. They did turn up and brought enough materials to finish as can be ....
It is Monday morning and although I came over on Saturday to see what was happening I forgot to take a photo. They did turn up and brought enough materials to finish as can be ....
Second day of screed mixing. Good progress but the materials are running out. Even with the extra bags of sand you can see in the driveway that were delivered this morning it will not be ....
Today the screeders arrived to lay the ground floor over the underfloor heating pipes. While they organised themselves, I finished off the installation of the earthing points in both the workshop and the car park ....
I have removed the plastic shuttering for the fountain foundation and have started playing with how it will look. I was just about able to move the base unit in which the pump is housed. ....
Before encasing it in concrete, it is always a good idea to pressure test it for any leaks. (It passed).
The last item to remove from the house is the old stairs from our old property that I have been using to get up to the first floor with. With the floor clear I can ....
I am pressing on with the heating as the floor screeners are due soon and this must be finished for them. In order to avoid moving the (heavy) roll of tubing all the time I ....
Back indoors and downstairs to fit the next loop in the heating. This time it is the kitchen, avoiding not just the walls but also the future units including the island un unit. Working with ....
While my two assistants watched on, I rearranged the main staircase components, moving them from the first floor to the upper mezzanine. I also sorted the various lengths of parquet ready for the next few ....
The first of the heating loops is installed. I took some measures as it is close to where a future enclosure in the bathroom is going to go. Having said that it will be covered ....