Workshop Refit

31 May 202423 June 2024 gjj

The tiles and grouting are set so I have cleaned them down (many were still stained with fire damage and charcoal) and started to replace the items in the workshop. As you can see I ....

Continue reading
BBQ/Workshop

First Floor Flooring 10

30 May 202424 June 2024 gjj

On my own again with the tilers gone. Took yesterday off after a straight 10 days on site. So it is back upstairs to the first floor oak parquet. An example of how I will ....

Continue reading
First Floor

Ground Floor Tiling 12

28 May 202423 June 2024 gjj

Metawaley grouted as much as he could in the house but ran out of material and my supplier had none left so I have had to order it. He was able to finish the grouting ....

Continue reading
BBQ/Workshop, Ground Floor

Ground Floor Tiling 11

27 May 202423 June 2024 gjj

Monday morning and no translator. we use google translate and get by pretty well.Matetawaley is enamoured with Judith after the excellent dinner we had last night. The shower is built and then tiled around and ....

Continue reading
BBQ/Workshop, Ground Floor

Ground Floor Tiling 10

26 May 202423 June 2024 gjj

It is Sunday morning and the tiling continues. I turn my attention to the corner all in the workshop to develop its structure. no drawings here I am winging it off the top of my ....

Continue reading
BBQ/Workshop, Ground Floor

Ground Floor Tiling 9

25 May 202423 June 2024 gjj

Saturday morning and the tilers arrive. Metawaley (who cannot drive or speak French, in red) and Oury (who can only work on weekends, drives and translates to arabic). I laid out the lines for them ....

Continue reading
Ground Floor

Ground Floor Tiling 8

24 May 202423 June 2024 gjj

It is Friday morning and I have come in just to lay the fall for the shower floor. The tiles are there to hold the pieces of wood that are protecting the sides. Once finished ....

Continue reading
BBQ/Workshop, Ground Floor

Ground Floor Tiling 7

23 May 202423 June 2024 gjj

Back to the shower drainage as the drains have arrived and the tilers are due to start on Saturday. This must be finished for them so I need to progress it. First I had to ....

Continue reading
Ground Floor

EV Charging, Travertine, Fountain and Ground Floor Tiling 6

22 May 202423 June 2024 gjj

I have finally received instructions on how to reset the Tesla charger and by following their instructions, I finally got it up and running. This records the first three phase charge using 16 Amps and ....

Continue reading
Electrics, Garden, Ground Floor

Ground Floor Tiling 5

21 May 202424 June 2024 gjj

Big panic today. I realised a few days ago that I had not installed a drainage outlet for the shower on the ground floor. So I have urgently organised some components and today I am ....

Continue reading
First Floor

Posts navigation

Older posts
Newer posts

Recent Posts

  • August 31
  • August 24
  • August 22
  • August 21
  • August 20

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.