Skip to content
  • 05:48
  • Saturday
  • 5 July 2025
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
  • M-B Importation
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
July 2  |  
July 1  |  
June 30  |  
June 28  |  
June 27  |  
Uncategorized

July 2

Full story
Master Bedroom

July 1

Full story
Uncategorized

June 30

Full story

July 26

26 July 202426 December 2024 gjj

Summary of the progress to date

Continue reading
Driveway, External

July 24

24 July 202426 December 2024 gjj

The gravel arrives on a lorry and trailer. While I hold the cables up above the entrance archway, the bags are hoisted over the wall and positioned for their bottoms to be sliced open to ....

Continue reading
External

July 23

23 July 202426 December 2024 gjj

The well takes shape Conecting them together was a bit of a nightmare bur Florent got it done. The fosse and drainage bed is inspected by eau17 with Florent and Andrew in attendance. After approval ....

Continue reading
Uncategorized

July 22

22 July 202426 December 2024 gjj

Kerbstones fitted for the limits of the entrance way for both cars and pedestrians. Erik has fitted the path lights and workshop board. I have fgot as far as I can with the gravel grids ....

Continue reading
Uncategorized

July 20

20 July 202426 December 2024 gjj

TEXT The front entrance is marked out for the limits of the gravel finish. Erik the electrician is due back to fit out some of the items in the workshop so I have prepared a ....

Continue reading
Uncategorized

July 19

19 July 202426 December 2024 gjj

A rodding eye for the sewage pipe and concrete bases for the pathway lights. The angled corner is completed with its pathway light As Alain and Jonathan level the paths, I follow up immediately with ....

Continue reading
Uncategorized

July 18

18 July 202426 December 2024 gjj

Florent connects the fosse to the overflow well. The car park is levelled and compacted and the final kerbstones are added with a slight adjustment to the plan to allow an angled corner to aid ....

Continue reading
Uncategorized

July 17

17 July 202426 December 2024 gjj

The fosse is stabilised with stone. This new design avoids a concrete base and anchoring to prevent the fosse from floating. instead the crenelated design of the sides are filled with stones and the whole ....

Continue reading
Uncategorized

July 16

16 July 202426 December 2024 gjj

Another flower bed emerges outside the kitchen window. Cables will need to be tidied but not until final positions of the panels is known. The PV distribution/Control Board is prepared and the BBQ panels isolation ....

Continue reading
Uncategorized

July 15

15 July 202426 December 2024 gjj

Panels and pathways take shape. My lifting system works well, even in the wind. The trickiest bit is getting the panel off the lifter and onto the roof but then it is relatively easy as ....

Continue reading
Uncategorized

Posts pagination

Previous page Page 1 … Page 16 Page 17 Page 18 … Page 45 Next page

Recent Posts

  • July 2
  • July 1
  • June 30
  • June 28
  • June 27

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.