November 28

With all the component finally here I can rearrange the layout of the PV distribution board. The change is necessary as I have had to split the BBQ roof panels from the Car Park roof panels so the house can be insured. The BBQ will feed the house with surplus sold back to EDF. The Car Park will all be sold direct to EDF with no connection to the house.

At the same time, the Enedis contractor (Boygues OS) have arrived to make the final connections for the house and the direct sale meters. The internal, final connections are down to me.

Luc is amazed that the lights work when he approaches them.

The house from the Car Park with lights on. The top of the house will eventually be lit with a series of security light similar to the one on the Car Park. The light by the BBQ is actually a reflection of the kitchen light in the workshop window.