Category: Ground Floor

July 29
Time to start the internal wall structures and tidy the workshop now that it is electrified only to find another visitor in the rear store that has got stuck in a bucket. I took it ....

External Slabs 1, PV Panels 12
The tilers finally arrived at about 11.00 this morning after telling me 08.00. They made a quick start. The first thing was the completion of the jointing on the ground floor. The assistant/driver can be ....

External Slabs Arrive, Plasterboard 1
I thought I would be smart and organise the collection of the plasterboard today as the external slabs are due to arrive and I have rented the forklift machine to bring them into the site. ....

Ground Floor Tiling 12
Metawaley grouted as much as he could in the house but ran out of material and my supplier had none left so I have had to order it. He was able to finish the grouting ....

Ground Floor Tiling 11
Monday morning and no translator. we use google translate and get by pretty well.Matetawaley is enamoured with Judith after the excellent dinner we had last night. The shower is built and then tiled around and ....

Ground Floor Tiling 10
It is Sunday morning and the tiling continues. I turn my attention to the corner all in the workshop to develop its structure. no drawings here I am winging it off the top of my ....