Category: First Floor

First Floor Flooring 3

26 April 202422 June 2024 gjj

In order to install the final heating loop I have had to take down the scaffolding that has been there for ever it seems. The ground floor is now clear. As I explained earlier the ....

Continue reading
First Floor

First Floor Flooring 2

24 April 202422 June 2024 gjj

Spot the difference? I have actually made some progress with the oak flooring on the first floor.

Continue reading
First Floor

Underfloor Heating 3

16 April 202422 June 2024 gjj

While my two assistants watched on, I rearranged the main staircase components, moving them from the first floor to the upper mezzanine. I also sorted the various lengths of parquet ready for the next few ....

Continue reading
Ground Floor, Lower Mezzanine, Plumbing, Upper Mezzanine

First Floor Flooring 1

15 April 202422 June 2024 gjj

So, with the upper mezzanine done I have moved to the lower mezzanine which is also the first floor and made a start on the oak flooring. I have had to jigsaw the boarding around ....

Continue reading
First Floor, Lower Mezzanine

Tidying Up

1 March 20244 March 2024 gjj

Another miserable, wet day. Not an issue as I planned to work inside today. First job was a serious tidy up as I need to get the ground floor cleared and ready for the underfloor ....

Continue reading
First Floor, Timber Frame

Windows and Timber Frame Installation 9

7 February 202411 February 2024 gjj

This morning I finished off the plywood cladding and then applied the breather paper to the upper section. I then spent the afternoon finishing the fitting the battens in preparation for the cladding. The right ....

Continue reading
First Floor, Ground Floor, Timber Frame

Floor Arranging

1 November 202311 February 2024 gjj

to maintain the flooring for the window installation I had to lift the temporary floor I had fitted (22mm) that is the attic floor and replace it with thinner (12mm) boarding that is destined for ....

Continue reading
Attic, First Floor

More Fencing and Floorboards

31 October 202311 February 2024 gjj

Dancing posts and gate cemented in. Lead flashing on storage roofs and the final joists are fitted.

Continue reading
Attic, Bike Store, External, First Floor, Garden

Floor Joists Again

28 October 202311 February 2024 gjj

More work on the attic floor joists while externally the ground is flattened and the pathway foundation rubble laid.

Continue reading
Attic, External, First Floor

More Flooring

26 October 202311 February 2024 gjj

With the old warped beams removed from the upper mezzanine, a support beam to level the new oak beams is placed in position. With the first floor and lower mezzanine joists in place I have ....

Continue reading
Attic, First Floor, Lower Mezzanine, Upper Mezzanine

Posts navigation

Older posts
Newer posts

Recent Posts

  • July 2
  • July 1
  • June 30
  • June 28
  • June 27

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.