Electrics and Utility Door
Hmm. Still trying to figure out how to connect the temporary supply as there were no instructions with the pre-wired unit. I need my multi-meter to work it all out. Esteban has finished shuttering the ....
Hmm. Still trying to figure out how to connect the temporary supply as there were no instructions with the pre-wired unit. I need my multi-meter to work it all out. Esteban has finished shuttering the ....
The pile of chalk is for blinding the levelled ground but Florent is off site today. Esteban started knocking through the new doorway in the utility room where the old chimney used to be. Meanwhile ....
When I arrived this morning after leaving early on Friday I was pleased to find the BBQ and Workshop area had been prepared and compacted along with the cleanse and preparation of the bike store. ....
With the pathway down to the house, The contractors concentrated on breaking out and levelling the internal floor and removing the internal wall. They did not take it all down as there was concern about ....
By Friday morning they were moving down the site preparing and compacting the pathway that will join the gates to the house but will also serve as the temporary roadway for Florent to get materials ....
Florent Maitre and his team arrived Monday 15th to start on site and I was there first thing to hand it over to him. The rest of the day and Tuesday I was otherwise occupied ....
Tea time over I took these high level shots to show the trenches all filled. Philippe and I then turned our attention to removing the rest of the first floor (or at least the bits ....
Philippe is once more in attendance as we push hard to finish backfilling the trenches. In between I also started and managed the fire to get that area cleared. Needed to dig a short length ....
With the trenches filled with cables and sand we added the warning tape and buried a large number of excess stones above it to protect it further. Once again it was Philippe who came over ....
So the last bit of electrical work is to install the 16mm² cable through to the car park and main road connection. It is the cable on the large wooden bobbin. Also to install the ....