I am using some of the oak I cut that was not used to support the electrical panel in the car park. Stephane is coming tomorrow to redo the plumbing so I have taken it ....
I am using some of the oak I cut that was not used to support the electrical panel in the car park. Stephane is coming tomorrow to redo the plumbing so I have taken it ....
I have finished cabling the panels on the car park roof and today the underfloor heating pipe is finally on site. All 500m of it. Should have been done before they fitted the heat pump ....
To enable the electrical earth to be tested, each of the three earthing points I have installed needs a breaker fitted. This allows the earth to be disconnected and tested then reconnected and tested to ....