July 23

The well takes shape

Conecting them together was a bit of a nightmare bur Florent got it done.

The fosse and drainage bed is inspected by eau17 with Florent and Andrew in attendance. After approval of the system the drainage bed is once again protected with a geotextile to separate the stones from the earth that will cover it.

The verbal approval allows Florent to finish burying the fo=sse and its drainage system to level the garden. Jonathan, Alain and I finish levelling the entrance way and inserting the gravel grids.

All complete and ready for the gravel to be delivered and laid tomorrow. I stayed late to get it finished.