July 22

Kerbstones fitted for the limits of the entrance way for both cars and pedestrians.

Erik has fitted the path lights and workshop board. I have fgot as far as I can with the gravel grids without cutting and Florent has refined the gateway stop that was dislodged during excavations.

Excavation for the “well” begins. Three connected 600mm pipes 3m long will be buried and joined to the rainwater system to trap a reservoir of water for pumping onto the garden in dry periods.

Gravel grids cut and fitted and the final front garden flower bed is marked out.