Concrete Floor Goes In
When I arrived on site it was about an hour before the concrete was due to arrive and I found four builders busy on the separation wall which, in a morning, they had just about ....
Utility areas including the cold room
When I arrived on site it was about an hour before the concrete was due to arrive and I found four builders busy on the separation wall which, in a morning, they had just about ....
After pouring the concrete for the lintel above the door, the team got back to floor preparation laying the reinforcing bar for the concrete pour. We wanted to organise it for this week but the ....
Yesterday we had a visit from the windows supplier to agree the height of the lintels above the new door in the utility room and for the existing windows. Florent can now get on with ....
After installing all the main cables underground, I received a call from the supplier to say that the manufacturer had condemned one of the cables as they had uncovered a manufacturing fault. Great! They shipped ....
The temporary barrier between our garden and Henri's has been taken down in preparation for laying the foundations of the wall that has to be built there. So for a while the dogs cannot be ....
The tie bar arrived late last night and when I arrived this morning it had already been positioned. I helped with the tensioning but essentially it is done and the remaining wall can be taken ....
Hmm. Still trying to figure out how to connect the temporary supply as there were no instructions with the pre-wired unit. I need my multi-meter to work it all out. Esteban has finished shuttering the ....
The pile of chalk is for blinding the levelled ground but Florent is off site today. Esteban started knocking through the new doorway in the utility room where the old chimney used to be. Meanwhile ....
When I arrived this morning after leaving early on Friday I was pleased to find the BBQ and Workshop area had been prepared and compacted along with the cleanse and preparation of the bike store. ....
With the pathway down to the house, The contractors concentrated on breaking out and levelling the internal floor and removing the internal wall. They did not take it all down as there was concern about ....