Skip to content
  • 23:13
  • Saturday
  • 5 July 2025
  • Home
  • Welcome
  • A New Project
  • Drawings
  • 15 Rue Sainte Benête Videos 28th march 2025
  • M-B Importation
15 rue Sainte Benête – The Development Blog

15 rue Sainte Benête – The Development Blog

Latest News
Welcome (Sticky Post)  |  
July 2  |  
July 1  |  
June 30  |  
June 28  |  
June 27  |  

Category: Ground Floor

January 20

20 January 20254 April 2025 gjj

TEXT

Continue reading
Ground Floor, Shower Room

January 17

17 January 20254 April 2025 gjj

TEXT

Continue reading
Shower Room

January 15

15 January 20252 April 2025 gjj

TEXT

Continue reading
Shower Room, Utility

January 14

14 January 20252 April 2025 gjj

TEXT

Continue reading
Shower Room

January 8

8 January 202510 January 2025 gjj

I am designing the shower room basin area on the fly to hide the services and form some useful shelving. Proving trickier than I thought. The front is now structured but I have to work ....

Continue reading
Ground Floor, Shower Room

January 7

7 January 202510 January 2025 gjj

Not much to show for a day’s work but these will be the ventilation pipes for the shower and utility rooms. A bit tricky getting the long pipe in through the bogging and with the ....

Continue reading
Ground Floor, Shower Room, Utility

January 6

6 January 202510 January 2025 gjj

With the cold store done (except for the ceiling) I turn my attention to the shower room. The sewage pipes are dismantled and glued back In place before getting hidden. Also found time to finally ....

Continue reading
Ground Floor, Shower Room, Utility

January 3

3 January 202510 January 2025 gjj

More plasterboarding in the cold store. The interior walls get insulated to separate the cold store from the rest of the house. Over the insulation the plasterboards are fitted. The final piece is over the ....

Continue reading
Cold Store, Ground Floor

January 2

2 January 202510 January 2025 gjj

First job is to paint behind the second column. First coat up and drying. While the paint dries the plasterboard is installed (uninsulated as it is the cold room). Some of the offcuts are used ....

Continue reading
Cold Store, Ground Floor

December 30

31 December 202410 January 2025 gjj

Time to hit the cold store. I need to finish the preparation for the tidy up of electric cables. All a bit of a mess at the moment and after a chat with Erik when ....

Continue reading
Cold Store, Ground Floor

Posts navigation

Older posts
Newer posts

Recent Posts

  • July 2
  • July 1
  • June 30
  • June 28
  • June 27

Archives

Categories

Proudly powered by WordPress | Theme: news-box by wpthemespace.com.