
EV Charger
To enable the electrical earth to be tested, each of the three earthing points I have installed needs a breaker fitted. This allows the earth to be disconnected and tested then reconnected and tested to ....
To enable the electrical earth to be tested, each of the three earthing points I have installed needs a breaker fitted. This allows the earth to be disconnected and tested then reconnected and tested to ....
It does not looks much but it took most of the day to fit the 16mm cabling in the distribution board then make the final connection at the temporary supply. 16mm is difficult to work ....