Fibre Optic Preparation
No photos today. Just me and Phillipe our neighbour on site pulling through fibre rods in preparation for the visit next week of free.com to install the fibre optique cables. It has been a long ....
No photos today. Just me and Phillipe our neighbour on site pulling through fibre rods in preparation for the visit next week of free.com to install the fibre optique cables. It has been a long ....
The finished repair of the front arch. Some changes to the kerbstones. The heat pump position had to be changed (the base was extended some time ago for it) so the pathway became too narrow ....
Today Florent and his team are back on site for a couple of days to sort out some minor snagging issues. So I have got them to help me fit the large fixed window in ....
Using my glass suction handles and a bit of ingenuity, I have been able to get the glass out of the frame and stood on some blankets. I have then fitted the frame in place ....
With the heating pipes completed I am able to look at other issues so have started to construct a missing wall in the workshop. Meanwhile, almost imperceptibly, the first floor continues to advance.
Before encasing it in concrete, it is always a good idea to pressure test it for any leaks. (It passed).
The last item to remove from the house is the old stairs from our old property that I have been using to get up to the first floor with. With the floor clear I can ....
In order to install the final heating loop I have had to take down the scaffolding that has been there for ever it seems. The ground floor is now clear. As I explained earlier the ....
Spot the difference? I have actually made some progress with the oak flooring on the first floor.
The plug has arrived so I have wired up the charger properly to feed back to the board. Only to find it is the wrong plug!