
July 19


A rodding eye for the sewage pipe and concrete bases for the pathway lights.

The angled corner is completed with its pathway light


As Alain and Jonathan level the paths, I follow up immediately with the gravel grids.



I get as far as I can with the entrance driveway to the house and have to switch to the car park as the fine chalk stone has run out.