First Floor Flooring 3
In order to install the final heating loop I have had to take down the scaffolding that has been there for ever it seems. The ground floor is now clear.
As I explained earlier the quality of the parquet leaves much to be desired. Here is an example of one of the water stained boards. I could just wait until sanding the whole floor but that might mean sanding much deeper than necessary locally around this problem. So before installing these pieces, I am sanding the ends manually to clean them up to good wood.
Spot the difference 2. Yes, more progress on the flooring.