{"id":2446,"date":"2024-04-02T21:09:41","date_gmt":"2024-04-02T19:09:41","guid":{"rendered":"https:\/\/15rsb.xsxtc.uk\/?p=2446"},"modified":"2024-06-22T16:14:54","modified_gmt":"2024-06-22T14:14:54","slug":"underfloor-heating-1","status":"publish","type":"post","link":"https:\/\/15rsb.xsxtc.uk\/?p=2446","title":{"rendered":"Underfloor Heating 1"},"content":{"rendered":"\n<p>Before the floor can be done I need to remove the scaffolding we have been using for the upper mezzanine. However, before removing them I need to finish preparing the beams for the oak flooring.  So today I have been moving the scaffolding around to give me access tossed the beams back as they arrived heavily marked with black stains (presumable from the machine that cut and planed them).<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"2508\" src=\"https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2103-1024x576.jpeg\" alt=\"\" class=\"wp-image-2508\" srcset=\"https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2103-1024x576.jpeg 1024w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2103-300x169.jpeg 300w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2103-768x432.jpeg 768w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2103-1536x864.jpeg 1536w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2103-2048x1152.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"2509\" src=\"https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2104-1024x576.jpeg\" alt=\"\" class=\"wp-image-2509\" srcset=\"https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2104-1024x576.jpeg 1024w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2104-300x169.jpeg 300w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2104-768x432.jpeg 768w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2104-1536x864.jpeg 1536w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2104-2048x1152.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<p>With the floor all marked out to show where the pipes go, the next job is to power nail the pipe clips into the concrete floor. An explosive activity!  The neighbours wondered what I was shooting. The second photo is the special manifold for the underfloor heating system.  It is a composite material that enables it to be used for both heating and cooling.  Apparently neither bronze nor stainless steel is recommended.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-1 is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"2510\" src=\"https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2105-1024x576.jpeg\" alt=\"\" class=\"wp-image-2510\" srcset=\"https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2105-1024x576.jpeg 1024w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2105-300x169.jpeg 300w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2105-768x432.jpeg 768w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2105-1536x864.jpeg 1536w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2105-2048x1152.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"576\" height=\"1024\" data-id=\"2511\" src=\"https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2106-576x1024.jpeg\" alt=\"\" class=\"wp-image-2511\" srcset=\"https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2106-576x1024.jpeg 576w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2106-169x300.jpeg 169w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2106-768x1365.jpeg 768w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2106-864x1536.jpeg 864w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2106-1152x2048.jpeg 1152w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2106-scaled.jpeg 1440w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/><\/figure>\n<\/figure>\n\n\n\n<p>Just for a break I got out and did a bit more tree trimming on the apple tree that was not done with the other fruit trees earlier in the year.  It and the conifer are growing into each other so need to be separated.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-3 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"2512\" src=\"https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2107-1024x576.jpeg\" alt=\"\" class=\"wp-image-2512\" srcset=\"https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2107-1024x576.jpeg 1024w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2107-300x169.jpeg 300w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2107-768x432.jpeg 768w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2107-1536x864.jpeg 1536w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/04\/IMG_2107-2048x1152.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Before the floor can be done I need to remove the scaffolding we have been using for the upper mezzanine. However, before removing them I need to finish preparing the beams for the oak flooring. So today I have been moving the scaffolding around to give me access tossed the beams back as they arrived [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2511,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,28,34],"tags":[],"class_list":["post-2446","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-external","category-ground-floor","category-plumbing"],"_links":{"self":[{"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=\/wp\/v2\/posts\/2446","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2446"}],"version-history":[{"count":5,"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=\/wp\/v2\/posts\/2446\/revisions"}],"predecessor-version":[{"id":2735,"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=\/wp\/v2\/posts\/2446\/revisions\/2735"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=\/wp\/v2\/media\/2511"}],"wp:attachment":[{"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2446"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2446"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2446"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}