{"id":1916,"date":"2024-02-02T19:27:00","date_gmt":"2024-02-02T17:27:00","guid":{"rendered":"https:\/\/15rsb.xsxtc.uk\/?p=1916"},"modified":"2024-02-11T14:04:42","modified_gmt":"2024-02-11T12:04:42","slug":"internal-electrics","status":"publish","type":"post","link":"https:\/\/15rsb.xsxtc.uk\/?p=1916","title":{"rendered":"Internal Electrics"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">It does not looks much but it took most of the day to fit the 16mm cabling in the distribution board then make the final connection at the temporary supply. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">16mm is difficult to work with because it is not at all flexible.  So I had to estimate the length including bends to avoid other cabling behind, pre-bend it then feed it in before screwing it in tight.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"1917\" src=\"https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/02\/IMG_1820-1024x576.jpeg\" alt=\"\" class=\"wp-image-1917\" srcset=\"https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/02\/IMG_1820-1024x576.jpeg 1024w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/02\/IMG_1820-300x169.jpeg 300w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/02\/IMG_1820-768x432.jpeg 768w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/02\/IMG_1820-1536x864.jpeg 1536w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/02\/IMG_1820-2048x1152.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"1918\" src=\"https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/02\/IMG_1821-1024x576.jpeg\" alt=\"\" class=\"wp-image-1918\" srcset=\"https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/02\/IMG_1821-1024x576.jpeg 1024w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/02\/IMG_1821-300x169.jpeg 300w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/02\/IMG_1821-768x432.jpeg 768w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/02\/IMG_1821-1536x864.jpeg 1536w, https:\/\/15rsb.xsxtc.uk\/wp-content\/uploads\/2024\/02\/IMG_1821-2048x1152.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">All done by late afternoon and I now have power and powered lights inside the house. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>It does not looks much but it took most of the day to fit the 16mm cabling in the distribution board then make the final connection at the temporary supply. 16mm is difficult to work with because it is not at all flexible. So I had to estimate the length including bends to avoid other [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[33,5,28],"tags":[],"class_list":["post-1916","post","type-post","status-publish","format-standard","hentry","category-electrics","category-external","category-ground-floor"],"_links":{"self":[{"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=\/wp\/v2\/posts\/1916","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1916"}],"version-history":[{"count":4,"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=\/wp\/v2\/posts\/1916\/revisions"}],"predecessor-version":[{"id":1922,"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=\/wp\/v2\/posts\/1916\/revisions\/1922"}],"wp:attachment":[{"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1916"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1916"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/15rsb.xsxtc.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}